Starting From
| Property Types | Apartments, Townhouses |
|---|---|
| Unit Types | 1, 2 & 3 Bedrooms |
| Handover | Q2 2027 |
| Developer | Emaar |
| Community | Dubai Creek Harbour |
| Down Payment | 10% |
| Payment Plan | 80/20Easy Payment Plan |
Palace Residences North by Emaar Properties sits on Creek Island in Dubai Creek Harbour. The project offers 1, 2 and 3 bedroom apartments plus 3 bedroom townhouses. It rises 33 floors and faces the canal and creek promenade. Homes start from around AED 1.23 million. Sizes range from about 639 sq ft for a one bedroom to nearly 1,924 sq ft for a townhouse. The handover is scheduled for the second quarter of 2027. Buyers can secure a unit with just a 10% down payment and follow the 80/20 payment plan.
The location is central to key parts of the city and provides good access to transport links and daily needs.
This project is meant for people who want a home near water features and city points. It brings residents close to parks, waterfront paths, eating spots and retail points. The setting gives views of Creek Beach, the skyline and the surrounding open spaces. With a plan that spreads across a main district, the project is part of a bigger neighbourhood that has places for work, leisure and ongoing growth.
Key Takeaways
Architecture
The building of Palace Residences North has a clear vertical structure that uses glass and clean lines. It is tall enough to offer views over the creek and surrounding water bodies. The layout places larger units on higher floors and provides open balconies or terrace areas for most homes. Design choices focus on straight lines, wide windows and efficient use of space.
The façade has repetition in window bands and shading elements to reduce heat gain. The overall frame supports views towards the beach, promenade and skyline. Common areas use simple finishes that feel open and well lit. The entrance lobby leads to lift banks that serve all residential levels. Public corridors are straight and easy to navigate.
10%
Down Payment
On Booking Date
70%
During Construction
Easy Installments
20%
On Handover
100% Completion